This article is from the source 'bbc' and was first published or seen on . It will not be checked again for changes.

You can find the current article at its original source at http://news.bbc.co.uk/go/rss/-/1/hi/business/8221540.stm

The article has changed 27 times. There is an RSS feed of changes available.

Version 2 Version 3
High speed railway decision due High speed railway decision due
(about 5 hours later)
Network Rail is due to announce its preferred route for a new high speed railway line linking London to the north of England and possibly Scotland. Network Rail is due to announce its preferred route for a new high speed railway line linking London and the north of England and possibly Scotland.
There is speculation that the company which runs Britain's rail infrastructure will favour building the new line up the country's west coast.There is speculation that the company which runs Britain's rail infrastructure will favour building the new line up the country's west coast.
This could mean rail journey times between London and Glasgow taking as little as two and a half hours.This could mean rail journey times between London and Glasgow taking as little as two and a half hours.
However, any final decision will be made by the government.However, any final decision will be made by the government.
That could depend heavily on how much it costs, said the BBC's transport correspondent, Richard Scott.That could depend heavily on how much it costs, said the BBC's transport correspondent, Richard Scott.
Easing pressureEasing pressure
The proposed new line would become the country's second high speed rail link after the line which runs from London St Pancras to the Channel Tunnel, used primarily by Eurostar services.The proposed new line would become the country's second high speed rail link after the line which runs from London St Pancras to the Channel Tunnel, used primarily by Eurostar services.
Network Rail says the new line is required to ease the pressure on Britain's railways. It says passenger numbers have rocketed by 40% over the past decade, and that by 2024 many existing lines will be at full capacity.Network Rail says the new line is required to ease the pressure on Britain's railways. It says passenger numbers have rocketed by 40% over the past decade, and that by 2024 many existing lines will be at full capacity.
Trains on any new line could travel at speeds of more than 180 miles per hour.Trains on any new line could travel at speeds of more than 180 miles per hour.
Something has to be done, there's not enough capacity on the rail network and there is increasing demand Christian Wolmar, Rail analystSomething has to be done, there's not enough capacity on the rail network and there is increasing demand Christian Wolmar, Rail analyst
However, if it is built along the west coast via Birmingham and Manchester, it would mean cities like Sheffield, Leeds and Newcastle missing out.However, if it is built along the west coast via Birmingham and Manchester, it would mean cities like Sheffield, Leeds and Newcastle missing out.
Rail analyst, Christian Wolmar, said the line might not give the best value for money.Rail analyst, Christian Wolmar, said the line might not give the best value for money.
"I think there's a big debate to be had. Do we really need a high-speed line which will absorb an enormous amount of resources, or would the money be better spent put into the existing network?"I think there's a big debate to be had. Do we really need a high-speed line which will absorb an enormous amount of resources, or would the money be better spent put into the existing network?
"Something has to be done, there's not enough capacity on the rail network and there is increasing demand."Something has to be done, there's not enough capacity on the rail network and there is increasing demand.
"But whether it should be a new high speed line or improving existing services is a matter for debate.""But whether it should be a new high speed line or improving existing services is a matter for debate."
Network Rail's announcement is due at 0945 BST.Network Rail's announcement is due at 0945 BST.