This article is from the source 'bbc' and was first published or seen on . It last changed over 40 days ago and won't be checked again for changes.
You can find the current article at its original source at https://www.bbc.co.uk/news/uk-england-oxfordshire-66023793
The article has changed 3 times. There is an RSS feed of changes available.
Version 0 | Version 1 |
---|---|
Pothole repair methods trialled on Oxfordshire road | |
(about 1 hour later) | |
Different methods of repairing potholes are being trialled on a road in Oxfordshire. | Different methods of repairing potholes are being trialled on a road in Oxfordshire. |
A 1km stretch (0.6 miles) of Hanney Road in Steventon was chosen for the trial - thought to be the first of its kind - due to the number of road defects needed to be repaired. | A 1km stretch (0.6 miles) of Hanney Road in Steventon was chosen for the trial - thought to be the first of its kind - due to the number of road defects needed to be repaired. |
Methods include using a machine called a Dragon Patcher and applying mastic asphalt. The results will be monitored over the coming years. | Methods include using a machine called a Dragon Patcher and applying mastic asphalt. The results will be monitored over the coming years. |
Almost 32,000 potholes were repaired by Oxfordshire County Council's contractor Milestone Infrastructure last year. | Almost 32,000 potholes were repaired by Oxfordshire County Council's contractor Milestone Infrastructure last year. |