This article is from the source 'bbc' and was first published or seen on . The next check for changes will be
You can find the current article at its original source at https://www.bbc.com/news/articles/ced28x5d5yno
The article has changed 7 times. There is an RSS feed of changes available.
Version 2 | Version 3 |
---|---|
M25: Section of motorway closed after waste lorry overturns | M25: Section of motorway closed after waste lorry overturns |
(32 minutes later) | |
The clean up operation following the crash is expected to be extensive | The clean up operation following the crash is expected to be extensive |
A section of the M25 has been closed after a waste lorry overturned in a crash with another HGV, causing a spillage of oil, diesel and waste on the motorway. | A section of the M25 has been closed after a waste lorry overturned in a crash with another HGV, causing a spillage of oil, diesel and waste on the motorway. |
The anticlockwise carriageway between junction six (Godstone) and five (Chevening) was shut at about 04:14 BST and is expected to remain closed throughout rush hour. | The anticlockwise carriageway between junction six (Godstone) and five (Chevening) was shut at about 04:14 BST and is expected to remain closed throughout rush hour. |
National Highways warned work to clear the "large spillage" will be "extensive and complex" and the road will need to be resurfaced. | National Highways warned work to clear the "large spillage" will be "extensive and complex" and the road will need to be resurfaced. |
One person was taken to Kings College Hospital in London, following the collision, said South East Coast Ambulance Service (SECAmb). | |
"The road will be closed through morning peak period," the agency said. | "The road will be closed through morning peak period," the agency said. |
National Highways said shortly after 7am there were delays of 40 minutes on the approach to the closed section. | National Highways said shortly after 7am there were delays of 40 minutes on the approach to the closed section. |
Just after 08:00 traffic caught within the closure had been cleared. | Just after 08:00 traffic caught within the closure had been cleared. |
A two-lorry collision has caused a section of the M25 to close on Wednesday | A two-lorry collision has caused a section of the M25 to close on Wednesday |
Drivers have been told to exit the M25 at junction six onto the A25 and rejoin the motorway after Sundridge. | Drivers have been told to exit the M25 at junction six onto the A25 and rejoin the motorway after Sundridge. |
The delays are affecting thousands of vehicles heading to or from locations such as Heathrow and Gatwick airports, the Port of Dover and the Eurotunnel terminal at Folkestone. | The delays are affecting thousands of vehicles heading to or from locations such as Heathrow and Gatwick airports, the Port of Dover and the Eurotunnel terminal at Folkestone. |
Surrey Police warned there has been congestion on the A25 through Oxted due to diversions and temporary traffic lights. | Surrey Police warned there has been congestion on the A25 through Oxted due to diversions and temporary traffic lights. |
Follow BBC Surrey on Facebook, on X and on Instagram. Send your story ideas to southeasttoday@bbc.co.uk or WhatsApp us on 08081 002250. | Follow BBC Surrey on Facebook, on X and on Instagram. Send your story ideas to southeasttoday@bbc.co.uk or WhatsApp us on 08081 002250. |