This article is from the source 'bbc' and was first published or seen on . It last changed over 40 days ago and won't be checked again for changes.
You can find the current article at its original source at http://www.bbc.co.uk/go/rss/int/news/-/news/uk-england-humber-16314779
The article has changed 4 times. There is an RSS feed of changes available.
Version 2 | Version 3 |
---|---|
North Sea Christmas ferry crossings from Hull cancelled | North Sea Christmas ferry crossings from Hull cancelled |
(about 2 hours later) | |
Ferry crossings from Hull to Belgium have been cancelled over Christmas due to a lock gate fault. | Ferry crossings from Hull to Belgium have been cancelled over Christmas due to a lock gate fault. |
Sailings were disrupted on Thursday evening after the failure of the lock gate at the city's King George Dock. | Sailings were disrupted on Thursday evening after the failure of the lock gate at the city's King George Dock. |
The sailing from Hull to Zeebrugge on Friday and the return journey on Christmas Eve have been cancelled and passengers have been contacted and offered alternative arrangements. | |
P&O Ferries said the situation was "regrettable, but beyond our control". | P&O Ferries said the situation was "regrettable, but beyond our control". |
The fault meant the Pride of York docked late on Thursday evening. | The fault meant the Pride of York docked late on Thursday evening. |
Dock owners Associated British Ports (ABP) said the problem was caused by two metal securing rods shearing off. | Dock owners Associated British Ports (ABP) said the problem was caused by two metal securing rods shearing off. |
ABP said the ferries were using the riverside berth at the dock and they "hoped to have a repair to the lock gate up and running by 28 December". | ABP said the ferries were using the riverside berth at the dock and they "hoped to have a repair to the lock gate up and running by 28 December". |