This article is from the source 'bbc' and was first published or seen on . It last changed over 40 days ago and won't be checked again for changes.
You can find the current article at its original source at http://www.bbc.co.uk/news/uk-england-bristol-23006599
The article has changed 2 times. There is an RSS feed of changes available.
Previous version
1
Next version
Version 0 | Version 1 |
---|---|
M4 and M5 speed limit ignored by drivers near Bristol | M4 and M5 speed limit ignored by drivers near Bristol |
(35 minutes later) | |
More than 24,000 people have broken a 50mph speed limit - six at more than 115mph - at roadworks near Bristol, in the past 17 months. | More than 24,000 people have broken a 50mph speed limit - six at more than 115mph - at roadworks near Bristol, in the past 17 months. |
Drivers were clocked on the M4 and M5, in a managed-motorway scheme similar to the M42 near Birmingham. | |
Last October, an FOI request by the BBC revealed one driver had driven through the roadworks at 137mph. | Last October, an FOI request by the BBC revealed one driver had driven through the roadworks at 137mph. |
Since then, five others have been clocked at more than 117mph - one at 128mph - a similar request has showed. | |
Avon and Somerset Police said a total of £311,000 had been paid in speeding fines. | |
The force said it may change the way traffic police patrol the area as a result. | |
Ch Insp Yan Georgiou said: "We will take a good look at these figures, we have got some good data here. | Ch Insp Yan Georgiou said: "We will take a good look at these figures, we have got some good data here. |
"We may make some adjustments to our patrolling plan, to deployment and to our education plan. | "We may make some adjustments to our patrolling plan, to deployment and to our education plan. |
"We will work together with the Highways Agency and other partners to ensure this stretch of the road network is as safe as it can be under the circumstances." | "We will work together with the Highways Agency and other partners to ensure this stretch of the road network is as safe as it can be under the circumstances." |
The roadworks are expected to be complete by October with the final scheme up and running in December. | The roadworks are expected to be complete by October with the final scheme up and running in December. |
Previous version
1
Next version