This article is from the source 'bbc' and was first published or seen on . It last changed over 40 days ago and won't be checked again for changes.

You can find the current article at its original source at http://www.bbc.co.uk/news/uk-england-london-25806581

The article has changed 3 times. There is an RSS feed of changes available.

Version 0 Version 1
Heathrow Airport: TfL criticises third runway proposal Heathrow Airport: TfL criticises third runway proposal
(35 minutes later)
Transport for London has criticised the Airport Commission's call for a new runway at Heathrow or Gatwick.Transport for London has criticised the Airport Commission's call for a new runway at Heathrow or Gatwick.
It said it favoured a long-term solution to expanding the UK's airport capacity, such as building a new airport.It said it favoured a long-term solution to expanding the UK's airport capacity, such as building a new airport.
TfL said the commission lacked "long-term vision" and placed more weight on "short-term commercial interests".TfL said the commission lacked "long-term vision" and placed more weight on "short-term commercial interests".
Mayor Boris Johnson, TfL's chairman, has called for a new airport in the Thames Estuary, dubbed Boris Island. TfL's chairman Boris Johnson has called for a new airport in the Thames Estuary, nicknamed Boris Island.
The commission has said it is carrying out "a thorough, comprehensive and transparent study" of airport capacity in the UK.The commission has said it is carrying out "a thorough, comprehensive and transparent study" of airport capacity in the UK.
'Vital national importance 'Vital national importance'
A TfL spokesman said: "The interim report and the recently published appraisal criteria places more weight on accommodating short-term commercial interests, than a strategic vision for aviation which is able to secure the UK's long-term economic prosperity.A TfL spokesman said: "The interim report and the recently published appraisal criteria places more weight on accommodating short-term commercial interests, than a strategic vision for aviation which is able to secure the UK's long-term economic prosperity.
"The commission identify a significant capacity gap in 2050, but do not address this. They focus instead on runway capacity options to 2030."The commission identify a significant capacity gap in 2050, but do not address this. They focus instead on runway capacity options to 2030.
"This does not provide the UK with a long term plan." "This does not provide the UK with a long-term plan."
Options floated by the commission include the creation of a third runway at Heathrow, or extending the northern runway to the west. Both would cause at least 750 homes to be demolished.Options floated by the commission include the creation of a third runway at Heathrow, or extending the northern runway to the west. Both would cause at least 750 homes to be demolished.
But TfL believes the extra runway would have swallowed all potential for growth by 2030, meaning domestic destinations would be "traded off against lucrative long-haul routes".But TfL believes the extra runway would have swallowed all potential for growth by 2030, meaning domestic destinations would be "traded off against lucrative long-haul routes".
Only a new four-runway hub could address this issue properly, TfL says.Only a new four-runway hub could address this issue properly, TfL says.
An Airports Commission spokesman said: "Decisions about airport capacity are of vital national importance and must be based on the best evidence available.An Airports Commission spokesman said: "Decisions about airport capacity are of vital national importance and must be based on the best evidence available.
"The commission is undertaking a thorough, comprehensive and transparent study subject to rigorous assessment considering economic, social and environmental impacts."The commission is undertaking a thorough, comprehensive and transparent study subject to rigorous assessment considering economic, social and environmental impacts.
"This work will continue to develop as comprehensive a picture as possible of the risks and opportunities of each option identified."This work will continue to develop as comprehensive a picture as possible of the risks and opportunities of each option identified.
"This will be followed by a full consultation later this year on the design and appraisal of each option.""This will be followed by a full consultation later this year on the design and appraisal of each option."