This article is from the source 'bbc' and was first published or seen on . It last changed over 40 days ago and won't be checked again for changes.
You can find the current article at its original source at http://www.bbc.co.uk/news/uk-england-cambridgeshire-26084154
The article has changed 3 times. There is an RSS feed of changes available.
Version 1 | Version 2 |
---|---|
First Capital Connect trains evacuated after balloon hits cables | First Capital Connect trains evacuated after balloon hits cables |
(about 5 hours later) | |
Two passenger trains were evacuated after a child's foil balloon hit overhead cables, causing a power cut in Cambridgeshire. | Two passenger trains were evacuated after a child's foil balloon hit overhead cables, causing a power cut in Cambridgeshire. |
Train operator First Capital Connect said the trains were stopped at 12:50 GMT just south of Huntingdon. | Train operator First Capital Connect said the trains were stopped at 12:50 GMT just south of Huntingdon. |
All lines were blocked and passengers going in both directions on the Peterborough to King's Cross East Coast Mainline route were taken off, he said. | |
Delays continued after the lines opened and services resumed. | |
Passengers on board the 10:45 GMT service from Leeds were stuck at Huntingdon for more than three hours, a spokesman for operator East Coast Trains confirmed. | Passengers on board the 10:45 GMT service from Leeds were stuck at Huntingdon for more than three hours, a spokesman for operator East Coast Trains confirmed. |
'Alternative routes' | 'Alternative routes' |
Their train was being "diesel-hauled" the rest of the way to London, he added. | |
Passengers were advised to check for the latest details about delays on the East Coast or First Capital Connect websites. | |