This article is from the source 'bbc' and was first published or seen on . It will not be checked again for changes.

You can find the current article at its original source at http://news.bbc.co.uk/go/rss/-/1/hi/england/berkshire/7832535.stm

The article has changed 4 times. There is an RSS feed of changes available.

Version 0 Version 1
Major tailbacks after M4 accident Major tailbacks after M4 accident
(10 minutes later)
A four-vehicle collision has caused major tailbacks on a motorway in Berkshire.A four-vehicle collision has caused major tailbacks on a motorway in Berkshire.
Two lanes have been closed on the M4 London-bound between junction 6 for Slough and junction 5 for Langley.Two lanes have been closed on the M4 London-bound between junction 6 for Slough and junction 5 for Langley.
Police said a lorry and a Vauxhall Corsa collided just before 0700 GMT before two other cars also crashed. Minor injuries have been reported.Police said a lorry and a Vauxhall Corsa collided just before 0700 GMT before two other cars also crashed. Minor injuries have been reported.
Tailbacks have been reported back to junction 7 where a car is also on fire on the hard shoulder. Tailbacks have been reported back to junction 8 and 9. A car is also on fire on the hard shoulder at junction 7.
'Oil and diesel''Oil and diesel'
Drivers are being advised to avoid the area.Drivers are being advised to avoid the area.
A Highways Agency spokesman said: "The vehicles are all on the hard shoulder.A Highways Agency spokesman said: "The vehicles are all on the hard shoulder.
"We've just started releasing traffic on one lane but there is oil and diesel on the carriageway which we are trying to clean up now."We've just started releasing traffic on one lane but there is oil and diesel on the carriageway which we are trying to clean up now.
"We've got people on the way to do this and and this will be done as soon as possible.""We've got people on the way to do this and and this will be done as soon as possible."
He believed the carriageway would be fully reopened by 0840 GMT.He believed the carriageway would be fully reopened by 0840 GMT.